You have a lot, or you are about to buy one. You may have a set of plans, or a builder who says the plans will be ready soon. You may even plan to run the job yourself. Now you need money, and you find that a regular mortgage does not fit. There is no finished house to lend against.
That is the gap a construction mortgage fills. It is a loan for a home that does not exist yet. The lender takes more risk than on a house that is built, so it asks for more from you. The rules are not hard to follow. They are just different. Learning them before you sign a contract saves months and sometimes thousands of dollars.
How a construction mortgage works
The lender does not hand you the full amount on day one. It releases the money in stages, called draws or advances. Each draw is tied to a point in the build. A common pattern looks like this:
- The first draw often covers the land or the first costs, and the foundation.
- The next draws follow milestones such as framing and the roof, then the electrical, plumbing and insulation.
- The last draw is released when the home is finished and ready to live in.
Before each draw, an inspector confirms that the work is done. Many lenders hire the inspector, and the cost usually lands on you. Lenders also hold back a share of each draw under BC's lien rules. That protects you and the lender if a trade is not paid.
During the build you normally pay interest only, and only on the money advanced so far. When the home is complete, the loan turns into a regular mortgage. Some lenders do this automatically. Others ask you to apply for the regular mortgage at that point, so ask which one applies to you.
What lenders look at first
A lender reviews two things: you and the project. For you, it checks income, credit and savings, the same way it does for any mortgage. For the project, the review is much longer. Lenders commonly ask for:
- Title to the land in your name, or a purchase that closes on or before the first draw.
- A full set of plans, building permits and a cost breakdown.
- A signed contract with the builder, or a detailed budget if you are the builder.
- An appraisal that shows the value of the finished home, not only the land.
- Proof that the builder is licensed and the home will have warranty cover, where the rules require it.
The lender also checks that the money will stretch to the end. It compares the cost to build with the draw schedule and with your own cash. If there is a shortfall, it will usually ask you to cover it before it advances anything.
How much down payment you need
A construction loan usually needs more down payment than a purchase. Many lenders look for 20 percent or more of the total project cost, and some ask for more on a self-build. Your land can count toward the down payment if you own it. If you have owned it for years, its value may cover a large part of what the lender wants.
Some insured programs allow a smaller down payment on a construction file. CMHC, for example, supports progress advances for new construction, and the insurers publish their own rules. Those rules change, and lenders add their own on top. A broker can check which ones apply to your file.
Building with a contractor
This is the simpler route. Lenders like a fixed-price contract with a licensed builder who has built homes of this size before. They also want to see that the home will be covered by a new home warranty, which BC requires for homes built for sale or by licensed builders. The BC rules set warranty periods of 2 years for materials and labour, 5 years for the building envelope and 10 years for the structure.
Ask the builder for the warranty details and the licence number early. Some lenders will not release a draw until they have seen both.
Building it yourself
An owner-builder is someone who builds a home for their own use and acts as their own general contractor. In BC, you need an Owner Builder Authorization from BC Housing, and you must pass an exam first. That authorization removes the third-party warranty that licensed builders must carry. It does not remove your responsibility. If you sell within 10 years, you stay liable for construction defects.
BC also limits what you can do with an owner-built home. You cannot sell it while it is still under construction. In most cases you must live in it for at least a year before you list it. If you sell within 10 years, you must give the buyer a disclosure notice from BC Housing.
Lenders are more careful with a self-build, because there is no builder with a track record. Some insurers do accept owner-builders, with conditions. One published rule, for instance, says no single trade contract can be more than half of the total cost. Many lenders will not do a self-build at all. Joshua can tell you early which ones will.
What it costs beyond the build
The build price is not the full cost. Plan for these, and ask each lender which ones apply:
- Interest on each draw during the build.
- Inspection and appraisal fees.
- Property taxes and insurance on the land, and builder's risk insurance during construction.
- Utility connections, permit fees and development cost charges set by your city or regional district.
- Cost overruns. Many lenders and brokers suggest holding a reserve of the budget for them.
- Rent or a second mortgage payment, if you must live somewhere else while you build.
Rates on construction loans are often a bit higher than on a regular mortgage, because the risk is higher. Do not compare them with the rate on a finished home. Compare them with other construction offers, and look at the draw rules and fees along with the rate.
Timing problems to avoid
- Signing the build contract before the lender sees it. A contract that does not meet the lender's rules can stall the loan.
- A budget with no cushion. If costs rise and the lender will not lend more, the gap is yours to fill.
- Assuming the end loan is automatic. Ask what happens when the build ends, and what rate and terms apply.
- Letting the rate hold run out. A long build can outlast a normal rate hold. Ask how long the lender will hold.
- Starting the build before the land is in your name. Most lenders will not advance without clear title.
How Joshua helps with a build
- A 15-minute call about the land, the plans, the builder and your savings.
- A lender check. Not every lender does construction, and credit unions and banks differ. Joshua tells you which ones fit your project before you pay for an appraisal.
- A review of the contract and budget against the lender's rules, before you sign.
- A plan for the end of the build, including the regular mortgage and the first renewal.
On a mortgage placed with an A lender, the lender pays the broker and you pay nothing for the service. Fees arise only on some B-lender and private files. They are disclosed in writing on BCFSA's Form 1A before you commit. See how brokers get paid for the details.
Related pages
If you are buying a lot and building later, read the page on purchase plus improvements as well. If you plan to add a suite, the secondary suite page explains how lenders count it. For land in the Agricultural Land Reserve, see the farm and ALR page. If you need cash for the down payment, see home equity lines and bridge financing.
Frequently asked questions
How does a construction mortgage work in BC?
The lender releases the loan in stages, called draws, as each part of the build is finished and inspected. You usually pay interest only on the amount advanced so far. When the home is complete, the loan converts to a regular mortgage, either automatically or after a new application. Terms vary by lender.
How much down payment do I need to build a home?
Many lenders look for 20 percent or more of the total project cost, and some ask for more on a self-build. Land you already own can count toward it. Some insured programs allow less, but the rules are set by the insurer and the lender, and both can change.
Can I act as my own general contractor?
In BC you need an Owner Builder Authorization from BC Housing, and you must pass an exam. Some lenders and insurers accept owner-builders, with extra conditions, and many do not. You stay responsible for defects for 10 years if you sell, so talk to the lender before you plan on it.
Do I need a home warranty on a new build?
Homes built by licensed builders must have third-party warranty cover in BC, with 2, 5 and 10 year periods for materials, the building envelope and the structure. Owner-builders are exempt, but they still carry the liability themselves. Lenders may ask to see the warranty before they release funds.
What happens if the build costs more than planned?
Most lenders will not raise the loan to cover overruns. You are expected to pay the extra from your own funds, so build a reserve into the budget. Ask the lender early how it handles a shortfall, since it may hold up the next draw until the gap is covered.
Is the rate on a construction loan higher?
Often it is a little higher than on a regular mortgage, because the lender takes more risk. Compare construction offers with each other, and look at fees, draw rules and what happens at the end of the build along with the rate.